-
NCEP GDAS/FNL 0.25 Degree Global Tropospheric Analyses and Forecast Grids
These NCEP FNL (Final) operational global analysis and forecast data are on 0.25-degree by 0.25-degree grids prepared operationally every six hours. This product is from the...- dataset GRIB
-
NCEP GFS 0.25 Degree Global Forecast Grids Historical Archive
The NCEP operational Global Forecast System analysis and forecast grids are on a 0.25 by 0.25 global latitude longitude grid. Grids include analysis and forecast time steps at a...- dataset GRIB
-
ECMWF IFS CY41r2 High-Resolution Operational Forecasts
ECMWF has implemented a significant resolution upgrade and methodology for high-resolution forecasts (HRES) and ensemble forecasts (ENS) beginning January of 2016. HRES is now...- dataset GRIB NetCDF
-
JRA-55: Japanese 55-year Reanalysis, Near Real-Time Data
Important Notice: Update of JRA-55 data will terminate at the end of January 2024. Please use Near Real-Time Japanese Reanalysis for Three Quarters of a Century (JRA-3Q)...- dataset GRIB
-
NCEP GDAS/FNL Global Surface Flux Grids
The NCEP operational Global Data Assimilation System surface flux grids are on a T574 Gaussian global grid. Grids include analysis and forecast time steps at a 3 hourly interval...- dataset GRIB
-
NCEP Climate Forecast System Version 2 (CFSv2) 6-hourly Products
The National Centers for Environmental Prediction (NCEP) Climate Forecast System (CFS) is initialized four times per day (0000, 0600, 1200, and 1800 UTC). NCEP upgraded their...- dataset GRIB
-
JRA-55: Japanese 55-year Reanalysis, Daily 3-Hourly and 6-Hourly Data
Important Notice: Update of JRA-55 data will terminate at the end of January 2024. Please use Japanese Reanalysis for Three Quarters of a Century (JRA-3Q)...- dataset GRIB
-
JRA-55: Japanese 55-year Reanalysis, Near Real-Time Data -- Monthly Means and...
The Japan Meteorological Agency (JMA) conducted JRA-55, the second Japanese global atmospheric reanalysis project. It covers 55 years, extending back to 1958, coinciding with...- dataset GRIB
-
NCEP/NCAR Global Reanalysis Products, 1948-continuing
Products from NCEP/NCAR Reanalysis Project (NNRP or R1) are archived in this dataset. The resolution of the global Reanalysis Model is T62 (209 km) with 28 vertical sigma...- dataset GRIB BUFR
-
ERA5 Reanalysis (0.25 Degree Latitude-Longitude Grid)
After many years of research and technical preparation, the production of a new ECMWF climate reanalysis to replace ERA-Interim is in progress. ERA5 is the fifth generation of...- dataset NetCDF GRIB
-
NCEP Climate Forecast System Reanalysis (CFSR) 6-hourly Products, January 197...
The National Centers for Environmental Prediction (NCEP) Climate Forecast System Reanalysis (CFSR) was initially completed over the 31-year period from 1979 to 2009 and has been...- dataset GRIB
-
Japanese 25-year Reanalysis Project
The Japanese 25-year Reanalysis (JRA-25) represents the first long-term global atmospheric reanalysis undertaken in Asia. Covering the period 1979-2004, it was completed using...- dataset GRIB
-
ERA-Interim Project, Monthly Means
ERA-Interim represents a major undertaking by ECMWF (European Centre for Medium-Range Weather Forecasts) to produce a reanalysis with an improved atmospheric model and...- dataset GRIB
-
WCRP and WWRP THORPEX YOTC (Year of Tropical Convection) Project
The realistic representation of tropical convection in our global atmospheric models is a long-standing grand challenge for numerical weather forecasts and global climate...- dataset GRIB
-
Historical Unidata Internet Data Distribution (IDD) Gridded Model Data
Historical Unidata Internet Data Distribution (IDD) Gridded Model Data are obtained via the Unidata Internet Data Distribution System (IDD). Data includes gridded analyses and...- dataset GRIB
-
JRA-55AMIP: The Japanese 55-year Reanalysis AMIP-type Simulation
As a subset of the Japanese 55-year Reanalysis (JRA-55) project, an experiment using the global atmospheric model of the JRA-55 was conducted by the Meteorological Research...- dataset GRIB
-
JRA-55: Japanese 55-year Reanalysis, Monthly Means and Variances
The Japan Meteorological Agency (JMA) conducted JRA-55, the second Japanese global atmospheric reanalysis project. It covers 55 years, extending back to 1958, coinciding with...- dataset GRIB
-
ERA-Interim Project, Single Parameter 6-Hourly Surface Analysis and Surface F...
ERA-Interim represents a major undertaking by ECMWF (European Centre for Medium-Range Weather Forecasts) to produce a reanalysis with an improved atmospheric model and...- dataset GRIB
-
ERA5.1: Corrections to ERA5 Stratospheric Temperature 2000-2006
In ECMWF Technical Memo 859 released in January 2020, Simmons and his coauthors report that "the ERA5 analyses of lower stratospheric temperature exhibit a pronounced cold bias...- dataset GRIB NetCDF
-
JRA-55C: The Japanese 55-year Reanalysis Using Conventional Data Only
As a subset of the Japanese 55-year Reanalysis (JRA-55) project, the Meteorological Research Institute of the Japan Meteorological Agency has conducted a global atmospheric...- dataset GRIB