-
ECMWF IFS High-Resolution Operational Forecasts
ECMWF has implemented a significant resolution upgrade and methodology for high-resolution forecasts (HRES) and ensemble forecasts (ENS) beginning January of 2016. HRES is now...- dataset NetCDF GRIB
-
NCEP Climate Forecast System Version 2 (CFSv2) 6-hourly Products
The National Centers for Environmental Prediction (NCEP) Climate Forecast System (CFS) is initialized four times per day (0000, 0600, 1200, and 1800 UTC). NCEP upgraded their...- dataset GRIB
-
NCEP GDAS/FNL 0.25 Degree Global Tropospheric Analyses and Forecast Grids
These NCEP FNL (Final) operational global analysis and forecast data are on 0.25-degree by 0.25-degree grids prepared operationally every six hours. This product is from the...- dataset GRIB
-
NCEP GFS 0.25 Degree Global Forecast Grids Historical Archive
The NCEP operational Global Forecast System analysis and forecast grids are on a 0.25 by 0.25 global latitude longitude grid. Grids include analysis and forecast time steps at a...- dataset GRIB
-
ERA5 Reanalysis (0.25 Degree Latitude-Longitude Grid)
2024-09-27. Important notice regarding RDA ERA5 GRIB files: Please note that DECS is in the process of completely phasing out whole file download, subsetting, and campaign...- dataset NetCDF GRIB
-
NCEP North American Regional Reanalysis (NARR)
The NCEP North American Regional Reanalysis products are on the Eta 221 grid at 29 pressure levels. They were produced using the Eta 32 km model with 45 vertical layers. The...- dataset GRIB
-
NCEP Climate Forecast System Version 2 (CFSv2) Selected Hourly Time-Series Pr...
The National Centers for Environmental Prediction (NCEP) Climate Forecast System (CFS) is initialized four times per day (0000, 0600, 1200, and 1800 UTC). NCEP upgraded CFS to...- dataset GRIB
-
JRA-55: Japanese 55-year Reanalysis, Daily 3-Hourly and 6-Hourly Data
Important Notice: Update of JRA-55 data will terminate at the end of January 2024. Please use Japanese Reanalysis for Three Quarters of a Century (JRA-3Q)...- dataset GRIB
-
JRA-55AMIP: The Japanese 55-year Reanalysis AMIP-type Simulation
As a subset of the Japanese 55-year Reanalysis (JRA-55) project, an experiment using the global atmospheric model of the JRA-55 was conducted by the Meteorological Research...- dataset GRIB
-
ERA-Interim Project
ERA-Interim represents a major undertaking by ECMWF (European Centre for Medium-Range Weather Forecasts) to produce a reanalysis with an improved atmospheric model and...- dataset GRIB
-
JRA-55C: The Japanese 55-year Reanalysis Using Conventional Data Only
As a subset of the Japanese 55-year Reanalysis (JRA-55) project, the Meteorological Research Institute of the Japan Meteorological Agency has conducted a global atmospheric...- dataset GRIB
-
ERA-20C Project (ECMWF Atmospheric Reanalysis of the 20th Century)
ERA-20C is ECMWF's first atmospheric reanalysis of the 20th century, from 1900-2010. It assimilates observations of surface pressure and surface marine winds only. It is an...- dataset GRIB
-
FSL MAPS Analysis Products, 40 km, 3-hourly
This dataset contains the FSL MAPS analyses on their native hybrid B vertical coordinate system.- dataset GRIB
-
JRA-55AMIP: Monthly Means and Variances Including Diurnal Statistics
As a subset of the Japanese 55-year Reanalysis (JRA-55) project, an experiment using the global atmospheric model of the JRA-55 was conducted by the Meteorological Research...- dataset GRIB
-
ERA5 back extension 1950-1978 (Preliminary version)
PLEASE NOTE. It is advised to use ds633.0, ERA5 Reanalysis (0.25 Degree Latitude-Longitude Grid) [https://rda.ucar.edu/datasets/ds633-0/]. ECMWF has announced that the...- dataset GRIB NetCDF
-
JRA-55: Japanese 55-year Reanalysis, Monthly Means and Variances
The Japan Meteorological Agency (JMA) conducted JRA-55, the second Japanese global atmospheric reanalysis project. It covers 55 years, extending back to 1958, coinciding with...- dataset GRIB
-
JRA-55: Japanese 55-year Reanalysis, Near Real-Time Data
Important Notice: Update of JRA-55 data will terminate at the end of January 2024. Please use Near Real-Time Japanese Reanalysis for Three Quarters of a Century (JRA-3Q)...- dataset GRIB
-
JRA-55: Japanese 55-year Reanalysis, Daily and Monthly Climatologies, 1991-2020
The Japan Meteorological Agency (JMA) conducted JRA-55, the second Japanese global atmospheric reanalysis project. It covers 55 years, extending back to 1958, coinciding with...- dataset GRIB
-
NCEP Climate Forecast System Reanalysis (CFSR) Monthly Products, January 1979...
The National Centers for Environmental Prediction (NCEP) Climate Forecast System Reanalysis (CFSR) was initially completed over the 31-year period from 1979 to 2009 and has been...- dataset GRIB
-
Japanese 25-year Reanalysis Project
The Japanese 25-year Reanalysis (JRA-25) represents the first long-term global atmospheric reanalysis undertaken in Asia. Covering the period 1979-2004, it was completed using...- dataset GRIB